LiveContent Roadmap
Revision as of 00:58, 24 October 2007 by Jon Phillips (talk | contribs) (→MONDAY 2007/10/29 (MONDAY))
Contents
MONDAY 2007/10/01
(DONE) CC working on autocurating content(DONE) ISSN number set up(DONE) design issues including icon, color options for desktop/DVD/DVD packaging addressed (tvol, bovinity)(DONE) documentation and revision of back panel to be more library specific (tvol)
MONDAY 2007/10/08
(DONE) check back with Fedora on hosting space for DVD iso(DONE) set up timeline for printing of sleeves and DVDs (tvol)(DONE) CC working on autocurating content (rejon)
MONDAY 2007/10/15
(DONE) CC work on build system(DONE) liase with redhat/fedora on build system (rejon)(DONE) work on library outreach(DONE) work on documentation for libraries
MONDAY 2007/10/22
- (DONE) build works
- informational page about CC, FOSS, LiveContent
- outline any copy or assets needed for design of the disk for bovinity prior to his availability (tvol, rejon)
- follow up with prospective library testers - 3 to 4 is good number (tvol)
- pull together list of content from Ahrash for OER (ahrash, tvol)
MONDAY 2007/10/29 (MONDAY)
- builds onto spins.f.o (asheesh)
- make sure there is autobuilding of the nightly disc and keep last 7 days (asheesh)
- CC work on autocurating tasks
- send prelim build to testers (tvol)
- roll the first builds past Fedora board to give OK of any cc branding
- post up an iso onto spins site and then send email to explain context of changes (paulproteus, tvol)
- NO ART (bov)
MONDAY 2007/11/05
- liblicense rpm demo build with and without and compare (0.5d) (paulproteus)
- Fedora 8 released Nov 8, make sure it builds ok (paulproteus)
- artwork commences, integrate artwork (bov)
- autocuration packages in (1d) (paulproteus)
MONDAY 2007/11/12
- revisions and buffer for unfinished tasks (tvol, paulproteus)
- Get revisions and testing out to testers
MONDAY 2007/11/19
- artwork to printers (Nov 19) (bovinity)
- Gold Master to manufacturers (Nov 19) (paulproteus, bovinity)
- Thanksgiving (all)
MONDAY 2007/11/26
- press set up for LC2.0 (tvol, rejon)
- blog post (tvol)
- library contacts (tvol)
- press release (tvol, rejon, ericsteuer)
- coordinate with Red Hat PR (tvol, rejon)
- coordinate with Worldlabel PR (tvol, rejon)
MONDAY 2007/12/03
- LiveContent 2.0 released (Dec 4) (all)