Difference between revisions of "Legal Tools Translation/4.0/Chinese - Traditional and Simplified"
(Added some links from the tracking sheet) |
|||
Line 33: | Line 33: | ||
==Translation process== | ==Translation process== | ||
− | Translation leads from CC China Mainland and CC Taiwan prepared in May 2016 the initial drafts and shared them with the group via email. Translation team members reviewed the initial drafts and made their comments on the document directly. Drafts were sent to the Regional Coordinator and HQ. The public comments were done via the mailing lists and websites of participating affiliate teams and the CC Asia Pacific mailing list. Comments were reviewed by the translation team members. The translation team discussed the comments at the Asia Pacific Regional Meeting in Beijing on Jul 2, 2016 (see the [1xO9i_9tiETHvTg5tfsVMb2blRVbj6NjDtbkBY84Xaz8 discussion notes]). Final drafts will be sent to Regional Coordinator and HQ. | + | Translation leads from CC China Mainland and CC Taiwan prepared in May 2016 the initial drafts and shared them with the group via email. Translation team members reviewed the initial drafts and made their comments on the document directly. Drafts were sent to the Regional Coordinator and HQ. The public comments were done via the mailing lists and websites of participating affiliate teams and the CC Asia Pacific mailing list. Comments were reviewed by the translation team members. The translation team discussed the comments at the Asia Pacific Regional Meeting in Beijing on Jul 2, 2016 (see the [https://docs.google.com/document/d/1xO9i_9tiETHvTg5tfsVMb2blRVbj6NjDtbkBY84Xaz8/edit?usp=sharing discussion notes]). Final drafts will be sent to Regional Coordinator and HQ. |
::Detailed plans and discussions so far: | ::Detailed plans and discussions so far: | ||
Line 47: | Line 47: | ||
::[https://docs.google.com/document/d/1glK6rdDzT3stt5LcGYx9gbLzzuS6H0HJUamYtsshkF8/edit Updated document with outcomes] | ::[https://docs.google.com/document/d/1glK6rdDzT3stt5LcGYx9gbLzzuS6H0HJUamYtsshkF8/edit Updated document with outcomes] | ||
− | ::[19bSKvx9DagZKI7XoMUEK6GrhwmKIZzsViVS_G_fyt1c Last set of comments] | + | ::[https://docs.google.com/document/d/19bSKvx9DagZKI7XoMUEK6GrhwmKIZzsViVS_G_fyt1c/edit Last set of comments] |
− | |||
==Key translation decisions and challenges== | ==Key translation decisions and challenges== |
Revision as of 07:47, 31 October 2016
Contents
Jurisdictions
China Mainland, Taiwan, Hong Kong, Singapore, Macau
Language coordination
To avoid confusion, the proposal is that CC refers to the following in connection with the linguistic translations of 4.0 and CC0, and that CC HQ allows both translations.
Translation Status
In progress.
Key dates
First draft was submitted: 4.01.2016
Public comment period:
Translation officially published:
Translation team
- Chunyan Wang, CC China Mainland
- Yi Zheng, CC China Mainland
- Xingzhi Xin, CC China Mainland
- Beibei Sun, CC China Mainland
- Ben Cheng, CC HK
- Ying Chan, CC HK
- Haggen So, CC HK
- Zhou Suibin, CC HK
- Ivan Chew, CC Singapore
- Tyng-Ruey Chuang, CC Taiwan
- Shun-Ling Chen, CC Taiwan
- Yi-Hsuan Lin, CC Taiwan
- Lucien Cheng-hsia Lin, CC Taiwan
Soohyun Pae will coordinate this project as regional coordinator.
Chunyan Wang from CC China Mainland and Yihsuan Lin from CC Taiwan will prepare the first drafts and lead the translation process. Other members of the translation team in HK, Singapore, and Macau will review the drafts and provide input from their local perspectives.
Translation process
Translation leads from CC China Mainland and CC Taiwan prepared in May 2016 the initial drafts and shared them with the group via email. Translation team members reviewed the initial drafts and made their comments on the document directly. Drafts were sent to the Regional Coordinator and HQ. The public comments were done via the mailing lists and websites of participating affiliate teams and the CC Asia Pacific mailing list. Comments were reviewed by the translation team members. The translation team discussed the comments at the Asia Pacific Regional Meeting in Beijing on Jul 2, 2016 (see the discussion notes). Final drafts will be sent to Regional Coordinator and HQ.
-
- Detailed plans and discussions so far:
-
- Draft Translations Completed for Public Comments
Key translation decisions and challenges
Translation files on staging server
To be published
Final translation files
To be published