Overview

  • CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011)
  • initial mockups provided by Lybba Dec 2010
  • design work will be continued by Fabricatorz Aug 2011
    • primary contacts Jon Phillips, Christoper Adams
  • CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer
  • All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions

Roadmap

  • note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC

Implement "phase 1" redesign for main CC website

  • "phase 1" is idea/mockup phase
  • 8/22 identify concrete elements of design to be implemented, any elements not feasible that will not be implemented
  • 8/26 home page and navigation elements implemented
  • 9/2 changes to interior landing and about themes/pages implemented
  • 9/9 overall look/navigation changes also implemented for license chooser
  • 9/16 bug fixing/testing completed, launch at CC global summit

Post-summit redesign of CC net/donor site

  • 10/7 integration of design elements from main website redesign completed for pre-testing of campaign soft launch

Post-campaign launch redesign of other sites

  • goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software
  • 10/14 wiki
  • 10/21 labs/other CC sites using wordpress multiuser
  • 10/28 search