Overview
- CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011)
- initial mockups provided by Lybba Dec 2010
- design work will be continued by Fabricatorz Aug 2011; primary contacts Jon Phillips, Christoper Adams
- CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer
- All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions
Roadmap
- note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC
Implement "Phase I" Creative Commons Redesign
- 8/23 CONCRETE PLAN: identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented
- priority of the site is what:
- donations/support, finding media and licensing media? what about culture, science, etc
- Strong Header needs to be decided
- Strong treatment of CC logo
- Strong menu, if we keep at all, need to go through menu items and decide
- Strong tagline or none at all?
- Header across the sites
- nuke subdomains and integrate into the site where possible
- Libbya design
- like the bottom graphic of affiliates, but should be a real map if use that, and should go to the affiliate locations
- somewhat like the curator area, but have question about what should go there, is it for blog posts? need to write software for maintenance
- menu: need to compare current and the libbya one
- look at the old site main page, and the current one, agree upon elements to keep or kill
- priority of the site is what:
- 8/26 HOMENAV IMPLEMENTED: home page and navigation elements implemented; check-in with CC web redesign committee
- 9/2 INTERIOR PAGES: changes to interior landing and about themes/pages implemented
- 9/9 LICENSE CHOOSER: overall look/navigation changes also implemented for license chooser; check-in with CC web redesign committee
- 9/16 REVIEW BUGFIX LAUNCH: bug fixing/testing completed, launch at CC global summit
Post-summit Redesign of Creative Commons Donor site
- 10/7 INTEGRATE CIVICRM: integration of design elements from main website redesign completed for pre-testing of campaign soft launch
Post-Campaign Launch Redesign of Other Sites
goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software
- 10/14 WIKI
- reality assessment on the integration
- 10/21 LABS: labs/other CC sites using wordpress multiuser
- What sites must stay and which must leave?
- 10/28 SEARCH
- Is this staying?
- CREATIVECOMMONS.NET
- Needs a reality assessment on continuing.