Difference between revisions of "Website update 2011"

From Creative Commons
Jump to: navigation, search
(Post-campaign launch redesign of other sites)
(Implement "phase 1" redesign for main CC website)
Line 11: Line 11:
  
 
=== Implement "phase 1" redesign for main CC website ===
 
=== Implement "phase 1" redesign for main CC website ===
* 8/22 identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented
+
* 8/22 CONCRETE PLAN: identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented
* 8/26 home page and navigation elements implemented; check-in with CC web redesign committee
+
* 8/26 HOMENAV IMPLEMENTED: home page and navigation elements implemented; check-in with CC web redesign committee
* 9/2 changes to interior landing and about themes/pages implemented
+
* 9/2 INTERIOR PAGES: changes to interior landing and about themes/pages implemented
* 9/9 overall look/navigation changes also implemented for license chooser; check-in with CC web redesign committee
+
* 9/9 LICENSE CHOOSER: overall look/navigation changes also implemented for license chooser; check-in with CC web redesign committee
* 9/16 bug fixing/testing  completed, launch at CC global summit
+
* 9/16 REVIEW BUGFIX LAUNCH: bug fixing/testing  completed, launch at CC global summit
  
 
=== Post-summit redesign of CC net/donor site ===  
 
=== Post-summit redesign of CC net/donor site ===  

Revision as of 14:54, 23 August 2011

Overview

  • CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011)
  • initial mockups provided by Lybba Dec 2010
  • design work will be continued by Fabricatorz Aug 2011; primary contacts Jon Phillips, Christoper Adams
  • CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer
  • All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions

Roadmap

  • note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC

Implement "phase 1" redesign for main CC website

  • 8/22 CONCRETE PLAN: identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented
  • 8/26 HOMENAV IMPLEMENTED: home page and navigation elements implemented; check-in with CC web redesign committee
  • 9/2 INTERIOR PAGES: changes to interior landing and about themes/pages implemented
  • 9/9 LICENSE CHOOSER: overall look/navigation changes also implemented for license chooser; check-in with CC web redesign committee
  • 9/16 REVIEW BUGFIX LAUNCH: bug fixing/testing completed, launch at CC global summit

Post-summit redesign of CC net/donor site

  • 10/7 integration of design elements from main website redesign completed for pre-testing of campaign soft launch

Post-campaign launch redesign of other sites

  • goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software
  • 10/14 wiki
  • 10/21 labs/other CC sites using wordpress multiuser
  • 10/28 search
  • cc.net?