Difference between revisions of "Website update 2011"
Jon Phillips (talk | contribs) (→Guides) |
Jon Phillips (talk | contribs) |
||
Line 11: | Line 11: | ||
* [[Website_update_2011/HOWTO_Update_Website_Front_Page]] | * [[Website_update_2011/HOWTO_Update_Website_Front_Page]] | ||
* [[Website update 2011 Past Notes]] | * [[Website update 2011 Past Notes]] | ||
+ | |||
+ | [[Category:Development]] [[Category:Website]] [[Category:2011]] |
Latest revision as of 07:06, 11 October 2011
Overview
- CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011)
- initial mockups provided by Lybba Dec 2010
- design work will be continued by Fabricatorz Aug 2011; primary contacts Jon Phillips, Christoper Adams
- CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer
- All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions