Jon Phillips (talk | contribs) (→Post-campaign launch redesign of other sites) |
Jon Phillips (talk | contribs) (→Roadmap) |
||
Line 10: | Line 10: | ||
* note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC | * note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC | ||
− | === Implement " | + | === Implement "Phase I" Creative Commons Redesign === |
* 8/22 CONCRETE PLAN: identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented | * 8/22 CONCRETE PLAN: identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented | ||
* 8/26 HOMENAV IMPLEMENTED: home page and navigation elements implemented; check-in with CC web redesign committee | * 8/26 HOMENAV IMPLEMENTED: home page and navigation elements implemented; check-in with CC web redesign committee | ||
Line 17: | Line 17: | ||
* 9/16 REVIEW BUGFIX LAUNCH: bug fixing/testing completed, launch at CC global summit | * 9/16 REVIEW BUGFIX LAUNCH: bug fixing/testing completed, launch at CC global summit | ||
− | === Post-summit | + | === Post-summit Redesign of Creative Commons Donor site === |
* 10/7 INTEGRATE CIVICRM: integration of design elements from main website redesign completed for pre-testing of campaign soft launch | * 10/7 INTEGRATE CIVICRM: integration of design elements from main website redesign completed for pre-testing of campaign soft launch | ||
− | === Post- | + | === Post-Campaign Launch Redesign of Other Sites === |
''goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software'' | ''goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software'' | ||
Revision as of 15:01, 23 August 2011
Contents
Overview
- CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011)
- initial mockups provided by Lybba Dec 2010
- design work will be continued by Fabricatorz Aug 2011; primary contacts Jon Phillips, Christoper Adams
- CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer
- All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions
Roadmap
- note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC
Implement "Phase I" Creative Commons Redesign
- 8/22 CONCRETE PLAN: identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented
- 8/26 HOMENAV IMPLEMENTED: home page and navigation elements implemented; check-in with CC web redesign committee
- 9/2 INTERIOR PAGES: changes to interior landing and about themes/pages implemented
- 9/9 LICENSE CHOOSER: overall look/navigation changes also implemented for license chooser; check-in with CC web redesign committee
- 9/16 REVIEW BUGFIX LAUNCH: bug fixing/testing completed, launch at CC global summit
Post-summit Redesign of Creative Commons Donor site
- 10/7 INTEGRATE CIVICRM: integration of design elements from main website redesign completed for pre-testing of campaign soft launch
Post-Campaign Launch Redesign of Other Sites
goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software
- 10/14 WIKI
- reality assessment on the integration
- 10/21 LABS: labs/other CC sites using wordpress multiuser
- What sites must stay and which must leave?
- 10/28 SEARCH
- Is this staying?
- CREATIVECOMMONS.NET
- Needs a reality assessment on continuing.