Difference between revisions of "Website update 2011"
(created public page to track 2011 cc.org redesign work) |
|||
Line 2: | Line 2: | ||
* CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011) | * CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011) | ||
* initial mockups provided by Lybba Dec 2010 | * initial mockups provided by Lybba Dec 2010 | ||
− | * design work will be continued by [http://fabricatorz.com/ Fabricatorz] Aug 2011 | + | * design work will be continued by [http://fabricatorz.com/ Fabricatorz] Aug 2011; primary contacts Jon Phillips, Christoper Adams |
− | |||
* CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer | * CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer | ||
* All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions | * All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions | ||
Line 12: | Line 11: | ||
=== Implement "phase 1" redesign for main CC website === | === Implement "phase 1" redesign for main CC website === | ||
− | + | * 8/22 identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented | |
− | * 8/22 identify concrete elements of design to be implemented, any elements not feasible that will not be implemented | ||
* 8/26 home page and navigation elements implemented | * 8/26 home page and navigation elements implemented | ||
* 9/2 changes to interior landing and about themes/pages implemented | * 9/2 changes to interior landing and about themes/pages implemented |
Revision as of 17:47, 19 August 2011
Contents
Overview
- CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011)
- initial mockups provided by Lybba Dec 2010
- design work will be continued by Fabricatorz Aug 2011; primary contacts Jon Phillips, Christoper Adams
- CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer
- All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions
Roadmap
- note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC
Implement "phase 1" redesign for main CC website
- 8/22 identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented
- 8/26 home page and navigation elements implemented
- 9/2 changes to interior landing and about themes/pages implemented
- 9/9 overall look/navigation changes also implemented for license chooser
- 9/16 bug fixing/testing completed, launch at CC global summit
Post-summit redesign of CC net/donor site
- 10/7 integration of design elements from main website redesign completed for pre-testing of campaign soft launch
Post-campaign launch redesign of other sites
- goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software
- 10/14 wiki
- 10/21 labs/other CC sites using wordpress multiuser
- 10/28 search